News
LCG, August 14, 2024 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2025, highlighting the region's rapid transition toward increased reliance on renewable energy resources and battery storage.
Read more
|
LCG, August 14, 2024 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2025, highlighting the region's rapid transition toward increased reliance on renewable energy resources and battery storage.
Read more
|
|
|
Industry News
Alstom Completes Installation of 6-MW Offshore Wind Turbine
LCG, November 21, 2013--Alstom announced yesterday that it has completed the installation of its new offshore wind turbine, the 6-MW Haliade? 150, off Ostend harbor at the Belwind site in Belgium.
With the new offshore installation, Alstom achieves an important milestone in the industrialization process of its 6-MW turbine. The new turbine will now help to confirm how the machine behaves in the offshore environment for which it was specifically designed and developed.
The offshore wind turbine design includes: a 150-meter rotor, a direct drive (that eliminates a gearbox), and a permanent-magnet generator. The design is intended to improve efficiency and reliability, while reducing operating and maintenance costs.
The 61-meter jacket has been set on top of pillars sunk to a depth of over 60 meters. Then the three elements of the 78-meter tower were gradually assembled on the jacket. In all, the nacelle towers at a height of over 100 meters above sea level. The height of the Statue of Liberty, including the base, is 93 meters. The overall weight of the turbine and its structure totals 1,500 tonnes.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|