EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2025 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, August 14, 2024 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2025, highlighting the region's rapid transition toward increased reliance on renewable energy resources and battery storage.

Read more

LCG Publishes 2025 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, August 14, 2024 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2025, highlighting the region's rapid transition toward increased reliance on renewable energy resources and battery storage.

Read more

Industry News

ERCOT Expects Record-breaking Peak Demand this Summer

LCG, March 2, 2018--The Electric Reliability Council of Texas (ERCOT) yesterday released its final Seasonal Assessment of Resource Adequacy (SARA) report for the upcoming spring season (March - May) and its preliminary assessment for the summer season (June - September). ERCOT, the grid operator for most of Texas, is predicting record-breaking peak usage this summer driven by the strong Texas economy. The combination of record-breaking peak usage and the recent retirement of older electric generating units is expected to result in tight operating reserves.

ERCOT's President and CEO stated, "The ERCOT market has experienced a series of new peak demand records over the last few years as Texas' economy continues to grow at record pace. We expect high peak demand will continue this summer."

ERCOT also anticipates voluntary load reductions and an increase in power sold in the market by industrial facilities in response to higher power prices during peak demand.

Total resource capacity for this summer is expected by ERCOT to be 77,658 MW. The preliminary summer SARA report includes a 72,974 MW summer peak load forecast based on normal weather conditions for 2002-2016. This forecast is higher than the all-time summer peak demand record of 71,110 MW set on August 11, 2016. Almost 3,800 MW in new generation resources began operating in 2017, and more than 14,000 MW of resources are planned to be in service by 2020.

The final summer SARA report will be released in May and will reflect the expected summer weather conditions.

In its final spring SARA report, ERCOT anticipates there will be adequate generation to satisfy system-wide demand under a range of extreme system conditions. The adjusted spring peak load forecast is expected 59,477 MW.

The SARA report is based on an assessment of generation availability and expected peak demand conditions at the time it was prepared. The assessment takes into account expected generation outages that typically occur during each season for routine maintenance, as well as a range of generation outage scenarios and weather conditions that could affect seasonal demand.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service